Page 51 - Aqualia MRSC 2015
P. 51

The mayor of Puente Genil inaugurated the new San Pancracio deposit built by Aqualia. This deposit
                                                  has two vessels, each with a storage capacity of 4,500 m3, something that is justified both by technical
                                                  regulations and maintenance to avoid the absence of flow. This increase in capacity helps to avoid
                                                  supply disruptions by solving pressure problems and it could have the potential to supply a population
                                                  of more than 30,000 people for a few days.

Meanwhile, the following measures will be carried out:

                                                  Aqualia is to build the new wastewater treatment plant at Albuñol in the Costa Tropical of Granada.
                                                  The project to build the sewer mains and the new treatment plant, which will provide a service to the
                                                  14,645 people living in Albuñol in the Costa Tropical of Granada, has been awarded by the Council for
                                                  the Environment and Territorial Planning to the joint venture made up of Aqualia and FCC Construcción.
                                                  The project, due to be completed in the next 2 years, is worth 3.6 million euros.
                                                  The works will entail building a WWTP that will treat wastewater from the towns of Albuñol, La Rábita
                                                  and Pozuelo. It also includes the construction of new pumping stations in El Pozuelo and La Rábita
                                                  and their corresponding impulsion pipelines and a WPS to which the pipes from the towns will be
                                                  connected and that will send the wastewater to the treatment plant.

                      WHAT ADVANTAGES DOES PUBLIC-
                      PRIVATE COLLABORATION HAVE FOR
                     THE WATER CYCLE?

                   It enables projects to be carried out in a shorter
                   space of time and with cost savings, taking
                 advantage of the technical knowledge and
                 experience of companies.

                                                                         #12verdadesSobreAgua

Challenges 2016

CLIENTS     Roll-out of client support app.
            Analysis of multi-channel tools and training of client support personnel.
INNOVATION  Redesign bills to enhance transparency.
            Promote the use of electronic billing as a sustainability tool.
            Improve transparency with citizens by improving access to the tax regulations and ordinances website (transparency in
            rates).
            New Smart Water projects and expansion of the current ones.
            Sustainability: first cars with biomethane from wastewater.
            Quality: first AnMBR demonstrator in operation.
            Intelligent management: establish agreements / implement pilot development of network optimisation tools, leak
            detection, monitoring, metering and software development.

                                                                                                                                                                   Service 51
   46   47   48   49   50   51   52   53   54   55   56