Location
                                                      Duration
               EDAR El Toyo (Almería)
              El Torno WWTP, Chiclana                     3 years
                de la Frontera (Cádiz)                 1/6/16-31/5/19




                                                    Participants

               Aqualia • Aarhus Universitet •Universitat Politécnica de Catalunya • UFZ • Future intelligence erevna tilepikinoniakon
             ke pliroforiakon systimaton epe • Gregersen Peder Simbiente, Engenharia e Gestao Ambiental lda University of Valladolid
              Solarspring gmbh • Teknologisk Institut • Autarcon gmbh • Instituto de Biología Experimental e Tecnológica • Renergie
              Systeme gmbh & Co kg • Biotrend • Office International de l’Eau • Isle Utilities Limited • Iclei European Secretariat gmbh




                                                       GOALS

                                           Biomethane, bioplastic,
                                                   biofertilisers

                                         Transform wastewater into value-added products







         2020
         Mides Project


         The MIDES (microbial                The desalination system             to create electricity and also
         desalination for low energy         will run on energy created          permit the migration of salts
         drinking water) project was         from wastewater treatment           through selective membranes.
         conceived for developing a          processes through equally
         unique and innovative system        new technology: microbial fuel      The project also explores
         to produce drinking water           cell. In this biological reactor,   several desalination pre- and
         with advanced desalination          bacteria use the organic            post-treatment concepts.
         processes at no energy cost.        material in the wastewater



                €8,069,593                          €2,696,993                             Aqualia

                    Total budget                          Aqualia                           Coordinator






                  Location
                                                      Duration
                  Dénia (Alicante)
                   Canary Islands                         4 years
                      Chile                            1/4/16-31/3/20






                                                    Participants

                Fujifilm • IMDEA Agua • SGL Carbon • LEITAT • Mikrolin Hungary • Oncontrol Technologies Simtech Simulation •
                                          Technology • UNESCO-IHE • University of Gabès





         06 SMART SERVICES                                                                                   77