Page 75 - RSC Aqualia 2017
P. 75

Participants
                  Location                            Duration
                                                                                      Koch Memnbrane System
                Alcázar de San Juan                       4 years                       University of Valencia
                   (Ciudad Real)                       1/7/14-30/6/18               Technical University of Valencia





                                                   OBJETIVOS

                                  70%                   80%                    80%

                             Energy consumption      CO2 emissions of        Biosolid waste
                            per m 3  of treated water  organic material       production








        Life Answer
        Project


        ANSWER (Advanced Nutrient           system developed by Aqualia         The project is a fresh boost
        Solutions With Electrochemical      during the ITACA project in         to the market of new
        Recovery) was a project             partnership with the University     technological solutions in the
        conceived to demonstrate            of Alcalá.                          food and beverage industry,
        a resource recovery system                                              which is among the highest
        from wastewater based on            In addition to reusing the water    consumers of water, with
        electrocoagulation processes        while producing energy, the         potential applications in
        and bioelectrochemical              project proposes recycling          other sectors for recovering
        reactors. ANSWER will               waste aluminium from cans           resources and energy.
        enable validation of the            as a flocculating agent when
        bioelectrogenic fluidised bed       pre-treating electrocoagulation.



                 €973,408                            €265,172                      Mahou San Miguel

                   Total budget                          Aqualia                             Leader




                                                                                        Participants
                  Location                            Duration
                                                                                       Aqualia Recuperaciones
               Mahou Alovera Factory                      3 years                       Tolón, S.A., University
                   (Guadalajara)                       1/9/16-31/5/19                        of Alcalá





                                                       GOALS

                                            Reduce consumption
                                    from 2.8 kWh/m  to 1.8 kWh/m                    3
                                                             3
                                                    And avoid water loss